Granny flat rules NZ: Can you build without Council approval?

Small black detached cabin on a grassy section

A granny flat, or more correctly a ‘Detached Minor Residential Unit’ (DMRU), can now be both a permitted activity and exempt from building consent. This is great news for anyone wanting to invest hundreds of thousands of dollars in a small house in their backyard, because it means the paperwork just got a whole lot easier.

Potentially.

That disclaimer matters because if land use were only about land, the use wouldn’t really matter. But it does.

It matters because the use of land is highly contested. When John Locke argued that private property could emerge from land originally held in common, there were presumably a few neighbours raising an eyebrow.

Because property rights represent an awkward tension. We tend to believe that owning something means we can control it. But land is different. It stays where it is, long after we’re gone, and what we use it for affects others. That includes the neighbours today as well as future generations.

Three hundred years after Locke, we have District Plans to define the line between the individual right to use land and the collective interest in constraining that use.

Government has no other end but the preservation of property.

John Locke

The new granny flat rules move that line. They give property owners greater freedom without asking Council for permission first. But moving the line is not the same as removing it.

Catch 1: ‘no consent’ does not mean ‘no Council’

The red tape has moved from the boundary to your front porch. The District Plan and Building Code still apply. But instead of being Council’s problem to administer, they have become your problem to manage.

Let’s break it down.

You need to apply for a Project Information Memorandum (PIM). This is basically you showing Council what you intend to do and them telling you what they know about the site and any requirements that may affect your proposal.

That includes whether the building is likely to qualify for a building consent exemption as well as information about District Plan overlays, natural hazards and infrastructure requirements. You’re essentially asking for information, not approval. And that information is only valid for two years without an extension.

Armed with this information, you still have to satisfy yourself that your proposal actually complies with the relevant requirements of the District Plan and Building Code.

Not to mention all the requirements outside the scope of a PIM, like the Regional Plan, relevant national environmental standards, the Heritage New Zealand Pouhere Taonga Act 2014 or Wildlife Act 1953, as well as any registered instruments on the record of title.

Catch 2: how do you know that you comply?

Self-certification and third-party certification are not the same thing. A PIM and some forms from an LBP and drainlayer are a long way from a Code Compliance Certificate (CCC). What will you tell the bank, the insurer or a purchaser?

A PIM is prospective by its very nature. It tells you what Council knows before you build. Under the building consent exemption there are no Council inspections. Compliance is instead demonstrated through the licensed building practitioners involved, the work they undertake and the forms they leave behind.

Forms may tell you what was done, but that’s only useful if what you eventually built was what was supposed to be built.

None of this makes the building unfinanceable or uninsurable. But it changes the evidence a bank, insurer or purchaser may reasonably want to see. If you’re spending hundreds of thousands of dollars on a house, that distinction matters.

So instead of paying Council to do the paperwork, more of it has landed on your desk. And with all that capital investment sitting there, the time for realisation will eventually come.

Catch 3: a house is not an allotment

When you do eventually come to subdivide, which you inevitably will want to, you could be facing an uphill battle with Council.

Subdivision isn’t just another land use. It’s a land use enabler.

The neatly carved-out permitted activity status and building consent exemption that apply to a granny flat pale in comparison with the regulation of subdivision, where everything is back on the table.

The location that made perfect sense when you were simply trying to fit another house into your backyard may make considerably less sense when you try to draw a new boundary around it.

You built a house. Now you want to create a property. The law treats those as quite different propositions.

Property and law are born together, and die together.

Jeremy Bentham

None of this means you shouldn’t build a granny flat.

Quite the opposite.

The Government has moved the line, which is a good thing. Property owners have greater freedom to make use of land they already own without first seeking permission from Council.

But freedom from asking permission is not freedom from responsibility. The rules haven’t been removed. It is the responsibility for understanding them that has moved from Council, onto you.

So before putting hundreds of thousands of dollars into your backyard, it pays to think beyond whether you can build a granny flat and ask what you might eventually want to do with it.

At Infill, that’s a question we’d rather answer now — before you break ground.